Skip to main content

Pittsburgh Water's South Side Flats Sewer Separation Project. .

The $14.8M project is a part of the Pennsylvania Department of Environmental Protection’s consent decree and entails separating the existing combined sanitary system with a standalone storm sewer system to reduce combined sewer overflows from South Side sewersheds within the City of Pittsburgh.

Services Performed

St. Elizabeth's Hospital Tank. .

A major component of the project is a 4,200 ft long 24” water transmission main connecting the new tank to DC Water’s system in the southeast portion of the District of Columbia. Due to the varied terrain, the water transmission main includes air release and blowoff valve vaults and isolation valves. The main also has cathodic protection, consisting of sacrificial anodes, an external coating, and electrical continuity.

Services Performed

HRSD York River Outfall and Diffuser . .

The outfall and diffuser is designed to convey a peak hydraulic flow of 75 MGD.  The existing 48" diameter outfall pipe was extended across the Yorktown Power Station’s (YPS) property approximately 1,500 feet to the bank of the York River and approximately 3,500 feet into the York River to a new 320-foot long, 35-foot deep, multi-port diffuser with 32 diffuser ports.  The new 48" diameter outfall pipe crossed multiple structures on the YPS property including the cooling water canal, ponds, buried utilities, roads, and parking lots.

Services Performed

Dan Beaver Presents at MdQI Conference.

Dan Beaver, from the York/Baltimore office, presented on the Greenmount Avenue Streetscape project at the Maryland Quality Initiative Conference (MdQI) in January. The project won the 2024 MdQI Project of the Year - Under $5 Million.

Dan Beaver speaking at MdQI

WRA to Design CCBC Renovation and Expansion.

WRA is designing the Community College of Baltimore County's Automotive Technology Renovation and Expansion. The building, located at the Catonsville campus, will have 4,000 SF of space renovated to increase the number of faculty and staff offices and expand classroom space. A 22,000 SF addition will increase the department's automotive laboratory space to support electric vehicle and emerging technology training.

CCBC Automotive building rendering

WRA Lands on Top 50 Trenchless List.

WRA ranked #50 on Trenchless Technology Magazine's annual list of Top 50 Trenchless Engineering Firms. The annual list is based on firm revenue generated by trenchless work in North America.

WRA Ranks as Top 50 Trenchless Engineering Firm.

WRA ranked #44, up from #50, on Trenchless Technology Magazine's 2024 list of Top 50 Trenchless Engineering Firms. Firms are ranked by North American trenchless revenue for the previous year or the company’s last fiscal year.

WRA Named to Baltimore Business Journal's Fast 50 List.

WRA was named as a fastest-growing private company. The Fast 50 recognition is based on a company's average two-year growth rate. 

WRA Moves up in ENR's Top 200 Environmental Firms Rankings.

WRA ranked #170, up from #179 last year, on Engineering News-Record’s Top 200 Environmental Firms list. 

WRA Ranked as Top 100 Private Company in Greater Baltimore.

WRA ranked 21st on the Baltimore Business Journal’s 2024 list of Top 100 Private Companies in Greater Baltimore.