Susquehanna Transmission Main. Baltimore, Maryland.

Designed to convey water from the Susquehanna River to the Montebello Filtration Plant, the Susquehanna Transmission Main is comprised of 38 miles of 96 and 108-inch transmission main.

WRA’s design of the 250 MGD Deer Creek Pumping Station was part of this important water supply project. WRA prepared eight separate contracts for the construction of the transmission main as an alternative/redundant source of raw water to the Montebello Filtration Plants. Designs included pipeline, tunnels, vaults with 8-inch vacuum relief/air release valves, 8-inch surge valves, drain valves and a 500 MGD intake structure. Designs included services for survey and right-of-way acquisition. WRA prepared the design for an upgrade contract to replace the vacuum relief and surge valves along the 38 mile route.

Susquehanna Transmission Main
Project Highlights

Water Transmission and Distribution

Civil design included general planning, layout, routing and final design of the transmission system. WRA provided the hydraulic designs that sized the 108 and 96-inch diameter portions of the system and established the pumping station design parameters.

Geotechnical

Geotechnical concepts for open cut and tunneling portions of the system were part of the design services.

Structural

Structural design of the vaults that served the surge protection system and the air release and vacuum relief valves were provided.